ECTIP Global B2B Sourcing & Market Entry Platform
Global Buyer RFQ

Purchase Requirement for Scaffolding – Vanuatu

Scaffolding I would like to procure a 20 foot container full of Aluminum Scaffolding. As an estimate for qtys see below, noting design is based on 3 stories of build and walk ways for entire length and 2 access ways; Standard tube segment (2.0 m): 192 PCS; Ledger 2.0 m: 144 PCS; Ledger 1.0 m: 96 PCS; Transom / Putlog 1.0 m: 144 PCS; Decking plank (2.5 m × 250 mm × 25 mm): 309 PCS; Baseplate: 64 PCS; Adjustable leg (screw jack + sleeve): 64 PCS; Ringlock coupler / rosette (estimate): 393 PCS; Toeboard: 336 m; Guardrail / handrail: 192 m; Stair module (flight): 24 PCS; Scaffold ladder beam 5.0 m: 8 PCS.

Buyer MarketVanuatu
CategoryIndustrial Parts
SubcategoryFasteners
QuantityTBD
Deadline2026-08-31T15:59:59.000Z
Statusquoting

Sourcing Requirements

Scaffolding I would like to procure a 20 foot container full of Aluminum Scaffolding. As an estimate for qtys see below, noting design is based on 3 stories of build and walk ways for entire length and 2 access ways; Standard tube segment (2.0 m): 192 PCS; Ledger 2.0 m: 144 PCS; Ledger 1.0 m: 96 PCS; Transom / Putlog 1.0 m: 144 PCS; Decking plank (2.5 m × 250 mm × 25 mm): 309 PCS; Baseplate: 64 PCS; Adjustable leg (screw jack + sleeve): 64 PCS; Ringlock coupler / rosette (estimate): 393 PCS; Toeboard: 336 m; Guardrail / handrail: 192 m; Stair module (flight): 24 PCS; Scaffold ladder beam 5.0 m: 8 PCS.

Explore Global RFQs