Sourcing Requirements
We have several immediate requirements of bladder tanks, expansion tanks to be Used in on-going project. Details are below and advise price and delivery schedule 1. Water Hammer Prevention Tank, 10m3 Qty: One Set We are supplying pumps for the above-mentioned projects There is requirement for water hammer prevention tank at the intake Pump station. The technical specifications and drawing are enclosed based on the drawing, or based on Taian standard design with The same tank capacity, 10m3 2. Expansion Tank / Bladder Tank, ASME, 500Litre Qty: One Set Refer to enclosed excel sheet for dimensions and size, as a guide You may based on your Taian design